New BOX-WIN reports published

The latest results of the BOX-WIN project have now been published. The results are presented in two Technical Reports which can be downloaded from our Downloads page.

Technical Report no. 4
“Assessing feasible mooring technologies for a Demonstrator in the Bornholm Basin as restricted to the modes of operation and limitations for the Demonstrator”

Technical Report no. 5
“Assessing important technical risks from use of a floating wind turbine unit equipped with pumps for oxygenation of the deepwater”

These reports concern mooring of a Demonstrator and technical risks which need to be considered in the construction of the Demonstrator.

Kommentera

E-postadressen publiceras inte. Obligatoriska fält är märkta *

Följande HTML-taggar och attribut är tillåtna: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>